Project overview
Air Design delivered the full ventilation scope for this presidential library, including thousands of feet of curved ductwork and linear diffusers.
Through early involvement and collaborative planning, our team partnered with multiple MBE firms to complete installation across a large and complex project site. The project’s stringent specifications resulted in an extremely efficient and quiet mechanical system.
What made this project complex
- Large site with challenging material handling
- Multiple system types across varied museum zones
- Tight logistical constraints for equipment delivery and staging
How we delivered
- Used shop-made fabricated boxes to stage and deliver duct and accessories efficiently
- Deployed multiple Trimble Robotic Stations for layout accuracy across trades
- Developed detailed delivery sequencing to meet site restrictions and minimize disruption
- Maintained clear communication with Lakeside Alliance and other stakeholders to keep the project on track
Results
Delivered over $2.4mm in MBE participation
Met all logistical, safety, and quality requirements
Named Lakeside Alliance Subcontractor Spotlight, recognizing exceptional performance and teamwork
Experts in complex HVAC and sheet metal projects