University of Chicago Medicine Cancer Hospital

Healthcare

Project overview

Air Design Systems led 40 weeks of BIM coordination at our own Partnership Center, followed by off-site prefabrication of five floors of ductwork and risers.

Using a tower crane, we managed efficient delivery and installation on a tight urban site. In total, over £1 million of ductwork was installed, along with 24 air handling units placed using a specialized gantry system for safety and efficiency.

What made this project complex

  • Small neighborhood footprint with limited crane access.
  • Required extensive coordination with Turner Construction and UCM for safety, traffic, and lifting operations.
  • High volume of truck deliveries managed daily.
  • Compliance requirements for hiring minority and local labor.

How we delivered

  • Pre-assembled sections sent out and crane-lifted into place.
  • Frequent field coordination meetings.
  • Prioritized communication and collaboration across trades.
  • Led the BIM coordination efforts at our Partnership Center.

Results

Delivered safe, efficient installation despite footprint limitations.

Recognized limitations of Air Handling Unit installation and developed a specialized gantry system.

Exceed all workforce goals and worked with local neighborhoods.